Facility Management - Part 5: Guidance on Facility Management processes

This European standard provides guidance to FM organisations on the development and improvement of their processes to support the primary processes.
This standard also sets out basic principles, describes high-level generic FM processes, lists strategic, tactical and operational processes and provides examples of process workflows.
This standard is written from a primary processes, demand perspective for an audience of all stakeholders in FM processes.

Facility Management - Teil 5: Leitfaden für Facility Management Prozesse

Dieses Dokument bietet FM-Organisationen eine Anleitung für die Entwicklung und Verbesserung ihrer Prozesse zur Unterstützung der Hauptaktivitäten.
Des Weiteren legt dieses Dokument die wesentlichen Grundsätze dar, beschreibt übergeordnete generische FM-Prozesse, führt strategische, taktische und operative Prozesse auf und bietet Beispiele zu Prozessabläufen.
Dieses Dokument ist aus Hauptprozess-, Bedarfsperspektive für alle an FM-Prozessen Interessierten geschrieben.

Facility management - Partie 5 : Guide relatif au développement et à l’amélioration des processus

Le présent document fournit des lignes directrices aux organismes de FM sur le développement et l’amélioration de leurs processus pour soutenir les processus principaux.
Le présent document établit également des principes de base, décrit des processus de FM génériques de haut niveau, répertorie des processus stratégiques, tactiques et opérationnels, et fournit des exemples de flux de travaux de processus.
Sur la base de processus principaux, le document est rédigé dans une perspective de demande et s’adresse à toutes les parties prenantes dans les processus de FM.

Upravljanje objektov in storitev - 5. del: Navodilo za procese upravljanja objektov in storitev

General Information

Status
Not Published
Public Enquiry End Date
23-Jan-2019
Technical Committee
Current Stage
4020 - Public enquire (PE) (Adopted Project)
Start Date
08-Nov-2018
Due Date
28-Mar-2019
Completion Date
23-Jan-2019

Relations

Buy Standard

Draft
prEN 15221-5:2019 - BARVE
English language
45 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
oSIST prEN 15221-5:2019
01-januar-2019
Upravljanje objektov in storitev - 5. del: Navodilo za procese upravljanja objektov
in storitev
Facility Management - Part 5: Guidance on Facility Management processes
Facility Management - Teil 5: Leitfaden für Facility Management Prozesse
Facility management - Partie 5 : Guide relatif au développement et à l’amélioration des
processus
Ta slovenski standard je istoveten z: prEN 15221-5
ICS:
03.080.10 Vzdrževalne storitve. Maintenance services.
Upravljanje objektov Facilities management
91.040.01 Stavbe na splošno Buildings in general
oSIST prEN 15221-5:2019 en,fr,de
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------
oSIST prEN 15221-5:2019

---------------------- Page: 2 ----------------------
oSIST prEN 15221-5:2019


DRAFT
EUROPEAN STANDARD
prEN 15221-5
NORME EUROPÉENNE

EUROPÄISCHE NORM

November 2018
ICS 03.080.10 Will supersede EN 15221-5:2011
English Version

Facility Management - Part 5: Guidance on Facility
Management processes
Facility management - Partie 5 : Guide relatif au Facility Management - Teil 5: Leitfaden für Facility
développement et à l'amélioration des processus Management Prozesse
This draft European Standard is submitted to CEN members for enquiry. It has been drawn up by the Technical Committee
CEN/TC 348.

If this draft becomes a European Standard, CEN members are bound to comply with the CEN/CENELEC Internal Regulations
which stipulate the conditions for giving this European Standard the status of a national standard without any alteration.

This draft European Standard was established by CEN in three official versions (English, French, German). A version in any other
language made by translation under the responsibility of a CEN member into its own language and notified to the CEN-CENELEC
Management Centre has the same status as the official versions.

CEN members are the national standards bodies of Austria, Belgium, Bulgaria, Croatia, Cyprus, Czech Republic, Denmark, Estonia,
Finland, Former Yugoslav Republic of Macedonia, France, Germany, Greece, Hungary, Iceland, Ireland, Italy, Latvia, Lithuania,
Luxembourg, Malta, Netherlands, Norway, Poland, Portugal, Romania, Serbia, Slovakia, Slovenia, Spain, Sweden, Switzerland,
Turkey and United Kingdom.

Recipients of this draft are invited to submit, with their comments, notification of any relevant patent rights of which they are
aware and to provide supporting documentation.

Warning : This document is not a European Standard. It is distributed for review and comments. It is subject to change without
notice and shall not be referred to as a European Standard.


EUROPEAN COMMITTEE FOR STANDARDIZATION
COMITÉ EUROPÉEN DE NORMALISATION

EUROPÄISCHES KOMITEE FÜR NORMUNG

CEN-CENELEC Management Centre: Rue de la Science 23, B-1040 Brussels
© 2018 CEN All rights of exploitation in any form and by any means reserved Ref. No. prEN 15221-5:2018 E
worldwide for CEN national Members.

---------------------- Page: 3 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
Contents Page
European foreword . 3
Introduction . 4
1 Scope . 6
2 Normative references . 6
3 Terms and definitions . 6
4 Principles of Facility Management processes . 8
4.1 General . 8
4.2 Summary . 9
4.3 Basic principles . 9
4.4 Facility management processes . 10
4.5 Structure of FM Processes . 11
5 Developing Facility Management Processes . 15
5.1 Introduction . 15
5.2 The importance of Facility Management processes . 16
5.3 Facility Management processes at a strategic level . 17
5.4 Facility Management processes at a tactical level . 23
5.5 Facility Management processes at operational level . 31
6 Assessing Facility Management processes . 34
6.1 Introduction . 34
6.2 Principles of FM organization . 34
6.3 Step 1: Check the alignment of FM processes with the organisations strategy . 34
6.4 Step 2: Check the connections between the FM processes . 35
6.5 Step 3: Check the used data / information . 35
6.6 Step 4: Check the workflows . 36
6.7 Step 5: Check the controlling of FM processes . 36
Annex A (informative) Examples of generic processes . 37
Annex B (informative) Checklist - Maturity of FM Organisations . 44
Bibliography . 45

2

---------------------- Page: 4 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
European foreword
This document (prEN 15221-5:2018) has been prepared by Technical Committee CEN/TC 348 “Facility
Management”, the secretariat of which is held by NEN.
This document is currently submitted to the CEN Enquiry.
This European Standard is one of the series ISO 41000 and EN 15221 “Facility Management” which
consists of the following parts:
1. ISO 41011:2017 Facility Management - Vocabulary
2. ISO 41012:Facility Management – Guidance on strategic sourcing and the development of
agreements
3. ISO/TR 41013 Facility Management – scope, key concepts and benefits
4. EN 15221 Part 3: Guidance on quality in Facility Management
5. EN 15221 Part 4: Taxonomy, Classification and Structures in Facility Management
6. EN 15221 Part 5: Guidance on Facility Management processes
7. EN 15221 Part 6: Area and Space measurement in Facility Management
8. EN 15221 Part 7: Performance Benchmarking
Note With the addition of the ISO standards, Part 1 and Part 2 of EN 15221 are withdrawn.
3

---------------------- Page: 5 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
Introduction
In 2013 the initiative was taken to interest parties at ISO level for the FM suite of standards of Europe,
the EN 15221 parts 1 to 7. This resulted in the re-development of the standards for vocabulary,
sourcing and agreements.
The result consists of the parts:
• ISO 41011 Facility Management – Vocabulary
• ISO 41012 Facility Management – Guidance on strategic sourcing and the development of
agreements.
• ISO/TR 41013 Facility Management – Scope. Key concepts and benefits.
These standards also build on widely accepted management principles, in particular value chain
(Porter, M E, (1985), “Competitive Advantage: creating and sustaining superior performance”, Free
Press, New York) and quality control (PDCA (Plan, Do, Check, Act). Deming, W E (1986), “Out of the
Crisis”, MIT, Cambridge). Reference to ISO 10014:2006, Quality management – Guidelines for realizing
financial and economic benefits.
The principles of the Deming cycle (PDCA) underpin all of the standards but are applied to a different
extent and depth in each. In fact there are different types of PDCA cycles depending of the term (e.g.
long term, short-term).
These standards align to EN ISO 9000 family of standards for Quality Management Systems and applies
specific guidance on the concepts and use of a process-based approach to management systems to the
field of Facility Management.
The term “facility services” is used as a generic description in the standards. The term “standardized
facility products” refers to the “standardized facility services” defined and described in EN 15221-4,
Facility Management – Part 4: Taxonomy, Classification and Structures in Facility Management.
Countries can decide to substitute the term “product” into “service”, when they consider that it is
important for a good acceptance and use of the standards in their own country.
The aim of all the standards is to provide guidance to Facility Management (FM) organizations on the
development and improvement of their FM processes to support the primary activities. This will
support organizational development, innovation and improvement and will form a foundation for the
further professional development of FM and its advancement in Europe. Therefore, generic examples
are provided in the standard to assist organizations.
These standards lay the foundation of the work that has to be done further more in developing Facility
Management, for e.g. benchmark standards prEN 15221-7
The aim of the standard is to provide guidance to all stakeholders concerned by Facility Management
(FM), especially providers and their clients on the development and improvement of their processes to
support the primary activities. This will support organisational development, innovation and
improvement and will form a foundation for the further professional development of FM and its
advancement in Europe.
Facility Management is defined in ISO 41011, Facility Management – Vocabulary, and ISO/TR 41013
Facility Management – Scope, key concepts and benefits as the “integration of processes within an
organisation to maintain and develop the agreed services which support and improve the effectiveness
of primary activities”. Underlying this definition is a process-based, management systems approach, as
defined in the EN ISO 9000 series.
4

---------------------- Page: 6 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
Further development of European Standards in Facility Management, based on ISO 41011 an 41013 will
rely therefore on a better understanding of the processes involved and the mechanisms for their
integration. These processes need to be identified and described, mapped and modelled to produce a
framework for Facility Management.
This standard lays the foundations of further work in developing Facility Management standards and
further develops the processes involved in creating FM agreements as described within ISO 41012 and
41013. The guidance provided in this standard established the need for the FM processes to start with
analysing and having a clear picture of the client organization and its primary processes as a basis for
the development of the FM strategy. All major decisions along the route to final specification of service
levels and qualities, choice of delivery model and eventually preparation of the appropriate form of
procurement and agreements flow from this basis.
This standard has been developed as one of four new standards and adopted an agreed set of principles,
underlying the Facility Management approach, to ensure consistency. These are incorporated in the
basic principles of a process-based management system upon which this standard is founded.
The standard aligns to EN ISO 9000 family of standards for Quality Management Systems and applies
specific guidance on the concepts and use of a process-based approach to management systems to the
field of Facility Management. The standard also builds on widely accepted management principles, in
particular value chain (Porter, 1985) and quality control (Deming, 1986) which underlie process-based
management systems.
The process approach, described in this document, should be widely applicable across the European
member countries. In order to do this they must build from the existing model in the previous standard
(ISO 41011 and 41013), be generic, and should not be too prescriptive and enable companies and
organisations to adapt them to their own processes.
Through applying the standard, organisations should be able to understand the importance of facility
management processes to their effectiveness and understand the need to assess the maturity of their
existing processes. This will provide a basis for developing and improving the facilities management
processes through a consistent, process-based management approach. Generic examples are provided
in the standard to assist organisations.
Facility management processes are integrated at three organisational levels - operational, tactical and
strategic. Agreements about the outcomes of these processes need also to be made at these three levels:
operational agreements with end-users, tactical agreement with business units and strategic agreement
with the senior management group (board, managing directors).
References:
Porter, M E, (1985), “Competitive Advantage: creating and sustaining superior performance”,
Free Press, New York;
Deming, W E (1986), “Out of the Crisis”, MIT, Cambridge.
5

---------------------- Page: 7 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
1 Scope
This document provides guidance to FM organisations on the development and improvement of their
processes to support the primary processes.
This document also sets out basic principles, describes high-level generic FM processes, lists strategic,
tactical and operational processes and provides examples of process workflows.
The document is written from a primary processes, demand perspective for an audience of all
stakeholders in FM processes.
2 Normative references
The following documents are referred to in the text in such a way that some or all of their content
constitutes requirements of this document. For dated references, only the edition cited applies. For
undated references, the latest edition of the referenced document (including any amendments) applies.
ISO 41011, Facility Management – Vocabulary
EN 15221-3, Facility Management - Part 3: Guidance on quality in Facility Management
EN 15221-4, Facility Management - Part 4: Taxonomy, Classification and Structures in Facility
Management
3 Terms and definitions
For the purposes of this document, the terms and definitions given in ISO 41011 and the following
apply.
ISO and IEC maintain terminological databases for use in standardization at the following addresses:
• IEC Electropedia: available at http://www.electropedia.org/
• ISO Online browsing platform: available at http://www.iso.org/obp
3.1
activities
tasks that are needed to complete deliverables
3.2
client
organisation that procures facility services by means of a Facility Management agreement
Note 1 to entry: The client acts on a strategic level and has a general and/or key function in all stages of the
relationship with the service provider. The customer specifies the facility services.
[ISO 41011 and ISO/TR 41013]
3.3
customer
organisational unit that specifies and orders the delivery of facility services within the terms and
conditions of a Facility Management agreement
Note 1 to entry: The customer acts on a tactical level.
[ISO 41010 and ISO 41012]
6

---------------------- Page: 8 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
3.4
end user
person receiving facility services
Note 1 to entry: A visitor could also be an end user.
[ISO 41011]
3.5
facility
tangible asset that supports an organisation
[ISO 41011]
3.6
facility management
integration of processes within an organisation to maintain and develop the agreed services which
support and improve the effectiveness of its primary activities
[ISO 41011]
3.7
facility management service provider
organisation that provides the client with a cohesive range of facility services within the terms and
conditions of a Facility Management agreement
Note 1 to entry: A Facility Management service provider can be internal or external to the client.
[ISO 41011]
3.8
facility service
support provision to the primary activities of an organisation, delivered by an internal or external
provider
Note 1 to entry: Facility services are services related to Space and Infrastructure and to People and
Organization.
[ISO 41011]
3.9
key performance indicator (KPI)
measure that provides essential information about the performance of facility services delivery
[ISO 41011]
3.10
primary activities
activities that constitute the distinctive and indispensable competencies of an organisation in its value
chain
Note 1 to entry: The distinction between the primary activities and support services is decided by each
organization individually; this distinction has to be continuously updated.
[ISO 41011]
7

---------------------- Page: 9 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
3.11
primary processes
processes, identified by an organisation, as essential to the provision of a service or product in its value
chain, direct to its customers
[ISO 41011]
3.12
process
set of interrelated or interacting activities, which transforms inputs into outputs
[EN ISO 9000]
3.13
service level
complete description of requirements of a product, process or system with their characteristics
Note The described set of characteristics in the service level can be graded within boundaries suitable for
measurement and analysis.
[ISO 41011 and ISO 41012]
3.14
service level agreement (SLA)
agreement between the client or customer and the service provider on performance, measurement and
conditions of services delivery
Note 1 to entry: A Facility Management agreement consists of general clauses, applicable to the whole
agreement, and SLA specific clauses, only applicable to a facility service. In a Facility Management agreement
several SLAs are included.
[ISO 41011 and ISO 41012]
3.15
sub process
discrete process operating within the bounds of another broader process
3.16
system
entity of interrelated processes, technologies or (business-) structures
4 Principles of Facility Management processes
4.1 General
This section summarizes a set of underlying principles that have been applied in developing the
guidance on Facility Management processes and have been used consistently in the ISO 41010 and the
EN 15221 series of standards.
8

---------------------- Page: 10 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
4.2 Summary
a) FM processes are triggered by changes on every level of the organization (requests for change by
end-user, customers and clients). In addition, the outputs of processes may also trigger the starting
of other processes. A process has a specific acknowledged starting point (with inputs) and a
definite end point (outputs);
b) a process consists of inputs, process activities and creates outputs. The output could be a delivered
facility service, a standardized facility product but for example also a negotiated contract, a
completed invoice or a final decision (which then may be an input for another process). The
outcome of a process is the satisfaction of requirements;
c) a process is a set of activities which plan, prepare, do, evaluate, check and report the process;
d) these activities are carried out in execution of identified responsibilities;
e) a process is described as the workflow of the activities carried out, checking the quality,
supervision of the process (including the response to defaults), and evaluation of the quality of the
outputs;
f) FM processes are linked to the demand of the organization;
g) demands may arise at the strategic, tactical and operational level;
h) these demands that are identified are transformed into FM requirements;
i) inputs into the FM processes are tangible assets, resources, data/information and conditions;
j) outputs from FM processes are facilities, decisions, proposals, data/information and results;
k) FM processes influence the effectiveness of the primary processes;
l) FM processes can be triggered by changes on every level of the organization (requests for change
by end users, customers and clients).It might be helpful to use the PDCA Cycle for controlling and
managing quality;
m) processes should be continuously improved.
4.3 Basic principles
The description of basic principles in this section of the standard connects a variety of different aspects
like general management concepts and principles with the content and construction of processes in
Facility Management. It will indicate the different levels, it will also show the interfaces between single
processes and introduces the systematic application of process thinking in this field.
Consistent with ISO 41011 and ISO/TR 41013, the process approach in this standard is derived from
the ISO Guidance on the Concept and Use of the Process Approach for management systems applied
specifically to the field of Facilities Management.
9

---------------------- Page: 11 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)

Figure 1 — Generic process
A key principle in this guidance refers to the output of processes as the satisfaction of the demands of
the primary processes.
Guidance on how to define, achieve and measure quality in facility management is found in EN 15221-3.
The classification of process inputs and outputs is to be found in EN 15221-4.
The user of the standard will be guided from a detailed level (4.5 Structure of FM processes) to a
general overview of processes (in Clause 5) and get an indication of relations and influences of the
processes in Facility Management. Although many other aspects would also show important aspects,
this section has the aim to provide a useful depth and broadness of the basic principles.
The relevance of the single processes varies according to the context of the organization (and its
primary processes) in which these processes are applied. An industrial environment, for instance, may
place an emphasis on operations and maintenance processes, in contrast to an administrative
environment, although both might happen in the same organization. In the same way, the status of an
organization (expanding, stagnating and shrinking) will impact on processes, as cost reduction,
reduction of usable space or maintenance strategies. Therefore, it is crucial to stress that the principles
of processes should be seen in the context of the overall processes of an organization. They are
considered within the relationship between the organization and Facility Management and are shown,
in the standard, as embedded in the FM Scope, key concepts and benefits of ISO/TR 41013
4.4 Facility management processes
4.4.1 General
The basis of the standardization of processes is the FM-scope of ISO/TR 41013 on one hand, and the
classification of facility products on the other (EN 15221-4). The FM scope defines and describes
demands of primary processes and supply by internal workforce or external providers. Connectivity
and coordination is required at 3 levels – the strategic, tactical and operational level.
Processes are sets of activities, with a specific order of these activities (workflow), a starting point and
end points and clearly defined inputs and required outputs. Processes have to be set up for the specific
circumstances and requirements of an organization.
10

---------------------- Page: 12 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
4.4.2 Standardized facility products
EN 15221-4 sets up a new approach to the structure of facility services by forming a defined set of
hierarchically structured facility services called standardized facility products.
The classification identifies a product in a hierarchy. For a given organization or a given provider
respectively facility products should be classified according to the standard. There is no necessity to
demand or supply the complete range of products.
The classification structure covers all 3 levels. The “facility product” on the strategic level is called FM
strategic integration and contains the integration of all purchased and used or consumed facility
products of an organization. It is considered as integration and not just a bundle of facility products.
At the tactical level, space and infrastructure and the integration for people and organization are
integrated.
At the operational level, there are standardized products. The classification is just an identification
code; there is no standardization in terms of internal quality or quantity of the facility product for both,
the provider and the purchasing and using or consuming organization.
4.5 Structure of FM Processes
4.5.1 General
According to EN ISO 9001:2008, processes consist of inputs, the workflow and outputs. In guidance on
the concept and use of the process approach for management systems the outputs, as a result of the
processes, are considered as satisfied requirements.
4.5.2 Process structure
The starting points in describing a process are the required inputs. When these inputs are available and
the required conditions and triggers are in place and the planning and preparation is fulfilled, the
workflow starts. The output is created at the end of the workflow. In Facility Management, these inputs
are tangible assets (equipment, desks, buildings, etc.), resources (manpower, energy, space and
data/information) as well as certain conditions (status of operation, cleanliness etc.), which trigger
different processes or sub-processes.
The workflow of an FM process consists of a logical sequence of activities linked to various elements
(capacities, competences), triggers (initiating pulses, conditions, results of other processes), events,
data, workflow structures and sub-processes. In order to achieve the outputs effectively, the workflow
has to incorporate responses to faults, failures and interruptions. When executed, a process has a
defined status and may trigger other processes.
The whole process and workflows, for the use of the inputs and achievement of requirements, needs to
be managed effectively and efficiently. The FM processes, managed by workflows, produce outputs
which are measurable FM products.
4.5.3 Process inputs
Looking at the various inputs, it is evident that certain processes contain different facilities, on which
the process will be carried out.
In Facility Management, these inputs are, for example, tangible assets (equipment, desks, buildings,
etc.), resources (manpower, energy, space and data/information) as well as certain conditions (status of
operation, cleanliness etc.), which trigger different processes or sub-processes.
Basic examples are shown in Clause 5 to give an indication of the process inputs. As an example, the
technical equipment of a building is the input for the operations and maintenance processes, the data
and even results of former maintenance activities add more inputs to the maintenance process. The
required resources are the necessary manpower, the handling materials, which are needed and the
11

---------------------- Page: 13 ----------------------
oSIST prEN 15221-5:2019
prEN 15221-5:2018 (E)
energy for the technical equipment. Conditions can be summarized as the required framework, such as
the timeframe in which a maintenance task can be executed, the operating status or age of the
equipment or the age, which also impacts on setting up a maintenance plan and its implementation.
4.5.4 Process workflow
Process activities are actions performed by specific actors, usually persons, in the planned order to
reach the target outcome. These activities have to take place in a logical sequence, called the workflow.
The optimum way of executing the activities is planned bef
...

Questions, Comments and Discussion