European digital cellular telecommunications system; Attachment requirements for Global System for Mobile communications (GSM) mobile stations; Access

This Technical Basis for Regulation (TBR) specifies the technical requirements to be met by terminal equipment capable of connection to a public telecommunications network. These requirements apply to terminals for phase 1 of the public land mobile radio service utilising constant envelope modulation, operating in the 900 MHz band with a channel separation of 200 kHz, and carrying 8 full rate traffic channels per carrier according to the Time Division Multiple Access (TDMA) principle. This TBR covers the requirements for Global System for Mobile communications (GSM) access to the network. For each conformance requirement, one or more test purposes are given. For each test purpose, a single reference is given to the test method in GSM 11.10 (I-ETS 300 020-1) [2]. The requirements apply at the air interface and the SIM-ME interface for the access requirements, which may be stimulated to perform the tests by additional equipment if necessary. The measurement uncertainty is handled, as described in GSM 11.10 (I-ETS 300 020-1) [2]. This TBR covers the essential requirements of the Terminal Directive 91/263/EEC [1] Articles 4d, 4e, 4f. Non access related aspects of speech telephony, where Article 4g has been applied, are covered by TBR 9 [7]. The Terminal Directive 91/263/EEC [1] Articles 4a and 4b are covered by other directives, and, therefore, not by this TBR. In this TBR, there are no EMC technical requirements in terms of the Terminal Directive 91/263/EEC [1], Article 4c. NOTE: Technical Requirements for EMC performance and testing of the equipment are covered by the relevant standards applicable to the EMC Directive 89/336/EEC, Annex A. Terminal equipment may be subject to additional requirements in other Common Technical Regulations (CTR)ydepending on the equipments functionality. GSM 11.10 (I-ETS 300 020-1) [2] constitutes the full conformance test suite for GSM. The verification of the conformance requirements in this TBR are based on the tests described in this

Evropski digitalni celični telekomunikacijski sistem - Priključitvene zahteve za mobilne postaje globalnega mobilnega komunikacijskega sistema (GSM) - Dostop

General Information

Status
Published
Publication Date
30-Sep-2004
Current Stage
6060 - National Implementation/Publication (Adopted Project)
Start Date
01-Oct-2004
Due Date
01-Oct-2004
Completion Date
01-Oct-2004
Mandate

Buy Standard

Standardization document
TBR 005 E1:2004
English language
271 pages
sale 10% off
Preview
sale 10% off
Preview
e-Library read for
1 day

Standards Content (Sample)

SLOVENSKI STANDARD
SIST TBR 005 E1:2004
01-oktober-2004
(YURSVNLGLJLWDOQLFHOLþQLWHOHNRPXQLNDFLMVNLVLVWHP3ULNOMXþLWYHQH]DKWHYH]D
PRELOQHSRVWDMHJOREDOQHJDPRELOQHJDNRPXQLNDFLMVNHJDVLVWHPD *60 'RVWRS
European digital cellular telecommunications system; Attachment requirements for
Global System for Mobile communications (GSM) mobile stations; Access
Ta slovenski standard je istoveten z: TBR 005 Edition 1
ICS:
33.070.50 Globalni sistem za mobilno Global System for Mobile
telekomunikacijo (GSM) Communication (GSM)
SIST TBR 005 E1:2004 en
2003-01.Slovenski inštitut za standardizacijo. Razmnoževanje celote ali delov tega standarda ni dovoljeno.

---------------------- Page: 1 ----------------------

SIST TBR 005 E1:2004

---------------------- Page: 2 ----------------------

SIST TBR 005 E1:2004
TECHNICAL TBR 5
BASIS for November 1993
REGULATION
Source: ETSI TC-SMG Reference: DTBR/SMG-005
ICS: 33.060.30
European digital cellular telecommunications system, Global System for Mobile communications
Key words:
(GSM)
European digital cellular telecommunications system;
Attachment requirements for Global System for Mobile
communications (GSM) mobile stations;
Access
ETSI
European Telecommunications Standards Institute
ETSI Secretariat
F-06921 Sophia Antipolis CEDEX - FRANCE
Postal address:
650 Route des Lucioles - Sophia Antipolis - Valbonne - FRANCE
Office address:
c=fr, a=atlas, p=etsi, s=secretariat - secretariat@etsi.fr
X.400: Internet:
Tel.: +33 92 94 42 00 - Fax: +33 93 65 47 16
Copyright Notification: No part may be reproduced except as authorized by written permission. The copyright and the
foregoing restriction extend to reproduction in all media.
© European Telecommunications Standards Institute 1993. All rights reserved.
New presentation - see History box

---------------------- Page: 3 ----------------------

SIST TBR 005 E1:2004
Page 2
TBR 5: November 1993
Whilst every care has been taken in the preparation and publication of this document, errors in content,
typographical or otherwise, may occur. If you have comments concerning its accuracy, please write to
"ETSI Editing and Committee Support Dept." at the address shown on the title page.

---------------------- Page: 4 ----------------------

SIST TBR 005 E1:2004
Page 3
TBR 5: November 1993
Contents
Foreword .11
1 Scope .13
2 Normative references.13
3 Information from the client to the test laboratory.14
4 Other requirements for GSM mobile stations.14
5 Structure of the TBR .14
6 References to GSM core specifications.15
7 Abbreviations.16
8 General tests and procedures.18
8.1 Support and non-support of services.18
8.2 Support of single numbering scheme .19
8.3 IMEI Security.20
9 Spurious emissions .21
9.1 MS allocated a channel (conducted spurious emissions).21
9.2 MS in idle mode (conducted spurious emissions) .22
9.3 MS allocated a channel (radiated spurious emissions) .23
9.4 MS in idle mode (radiated spurious emissions).23
10 Transmitter .24
10.1 Phase error and frequency error.24
10.2 Frequency error under multipath and interference conditions .25
10.3 Peak transmitter carrier power and burst timing.26
10.4 Output RF spectrum, modulation and switching transients .28
11 Receiver .29
11.1 Sensitivity.29
11.1.1 Reference Sensitivity for TCH/FS .30
11.1.2 Reference sensitivity for Control Channel (CCH).31
11.2 Usable Receiver Input Level Range .32
11.3 Co-channel rejection.32
11.3.1 TCH-Full Rate Speech .33
11.3.2 Control Channel .34
11.4 Adjacent channel rejection.34
11.4.1 Adjacent interferer 200 kHz (I2W).34
11.4.2 Adjacent interferer 400 kHz (I4W).36
11.5 Intermodulation rejection .38
11.6 Blocking and spurious response.39
11.6.1 TCH-Full Rate Speech .39
11.6.2 TCH Control Channel.40
12 Tests of Layer 2 signalling functions .41
12.1 Timing requirements and frame format .41
12.1.1 Timing requirements .41
12.1.2 Frame format.41
12.2 Initialisation when contention resolution required .42
12.2.1 Normal initialisation .42
12.2.2 Initialisation failure.43

---------------------- Page: 5 ----------------------

SIST TBR 005 E1:2004
Page 4
TBR 5: November 1993
12.2.2.1 Loss of UA frame . 43
12.2.2.2 UA frame with different information field. 44
12.2.2.3 Information frame or supervisory frames in response to
an SABM frame. 44
12.2.3 Initialisation denial. 45
12.2.4 Total initialisation failure . 46
12.3 Initialisation, contention resolution not required . 46
12.3.1 Normal initialisation. 47
12.3.2 Initialisation failure . 47
12.3.3 Initialisation denial. 48
12.3.4 Total initialisation failure . 49
12.4 Normal information transfer . 50
12.4.1 Sequence counting and I frame acknowledgements. 50
12.4.2 Receipt of an I frame in the timer recovery state. 51
12.4.3 Segmentation and concatenation . 52
12.5 Normal Layer 2 disconnection. 53
12.6 RR response frame loss (MS to SS). 53
12.7 Test of frame transmission with incorrect C/R value. 54
12.8 Test of errors in the control field. 55
12.9 Test on receipt of invalid frame. 56
13 Initial Tests. 57
13.1 Scheduling of the channel request transmission. 57
13.1.1 Txinteger is low, non-combined case . 57
13.1.2 Txinteger is low, combined case . 59
13.1.3 Txinteger and Maxretrans are put to random values, non combined case . 60
13.1.4 Txinteger and Maxretrans are put to random values, combined case . 62
13.1.5 Test of random generator. 63
13.2 IMSI detach/attach . 63
13.2.1 IMSI attach and detach are not allowed, SIM remains continuously in the
ME . 64
13.2.2 IMSI attach and detach are not allowed, SIM is removed and put again. 64
13.2.3 IMSI attach and detach are required, the MS is powered off. 65
13.2.4 IMSI attach and detach are required, the MS is powered on. 66
13.2.5 IMSI attach and detach are required, SIM is removed . 67
13.2.6 IMSI attach and detach are required, SIM is inserted. 68
13.3 Test of sequenced MM/CC message transfer . 68
14 Test of MS functions in idle mode . 69
14.1 MS indication of available PLMNs. 69
14.2 MS will send only if BSS is "On air". 70
15 Test of L3 error handling . 70
15.1 Errors in L3 messages . 70
15.1.1 Wrong protocol discriminator. 70
15.2 Test of MS reaction to errors in Transaction Identifier . 71
15.2.1 Test of TI error in RR management message. 71
15.2.2 Test of TI error in MM message . 71
15.2.3 Test of TI error in CC message . 72
15.2.3.1 Test of TI error in CC message - 1st case. 72
15.2.3.2 Test of TI error in CC message - 2nd case. 73
15.2.3.3 Test of TI error in CC message - 3rd case . 73
15.2.3.4 Test of TI error in CC message - 4th case. 74
15.3 Test of message type errors . 74
15.3.1 Test of MS reaction to non-existent message type - CC protocol . 74
15.3.2 Test of MS reaction to message inconsistent with Call Control PD. 75
15.3.3 Test of MS reaction to message inconsistent with call state . 76
15.4 Test of general information element errors. 76
15.4.1 Test of MS response to duplicated Information Elements. 76
15.5 Test of MS reaction to mandatory information element errors. 77
15.5.1 Test of MS reaction to Mandatory Information Element errors in RR
message . 77

---------------------- Page: 6 ----------------------

SIST TBR 005 E1:2004
Page 5
TBR 5: November 1993
15.5.1.1 Test of MS reaction to Mandatory Information Element
errors in RR message - CHANNEL RELEASE.77
15.5.1.2 Test of MS reaction to Mandatory Information Element
errors in RR message - CIPHER MODE COMMAND.77
15.5.2 Test of MS reaction to Mandatory Information Element errors in MM
message.78
15.5.3 Test of MS reaction to Mandatory information Element errors in CC
message.79
15.5.3.1 Test of MS reaction to Mandatory Information Element
errors in CC message - 1st case.79
15.5.3.2 Test of MS reaction to Mandatory Information Element
errors in CC message - 2nd case.79
15.5.3.3 Test of MS reaction to Mandatory Information Element
errors in CC message - 3rd case .80
15.6 Test of MS reaction to non-mandatory information element errors .81
15.6.1 Test of MS reaction to non-mandatory information element errors in RR
message.81
15.6.1.1 Test of MS reaction to unrecognized information element
in RR message on a dedicated control channel -
comprehension required.81
15.6.1.2 Test of MS reaction to unrecognized information element
in RR message on a dedicated control channel -
comprehension not required.81
15.6.2 Test of MS reaction to non-mandatory information element errors in MM
message.82
15.6.2.1 Test of MS reaction to non-mandatory information
element errors in MM messages - comprehension
required.82
15.6.2.2 Test of MS reaction to non-mandatory information
element errors in MM messages - comprehension not
required.83
15.6.3 Test of MS reaction to non-mandatory information element errors in CC
message.84
15.6.3.1 Test of MS reaction to non-mandatory information
element errors in CC messages - 1st case .84
15.6.3.2 Test of MS reaction to non-mandatory information
element errors in CC messages - 2nd case.84
15.6.3.3 Test of MS reaction to non-mandatory information
element errors in CC messages - 3rd case.85
15.6.3.4 Test of MS reaction to non-mandatory information
element errors in CC messages - 4th case.86
15.6.3.5 Test of MS reaction to non-mandatory information
element errors in CC messages - 5th case.86
16 Elementary procedures for Radio Resource management.87
16.1 Immediate assignment.87
16.1.1 Assignment procedure .87
16.1.2 Extended assignment.88
16.1.3 Assignment rejection.89
16.1.4 Ignore assignment for another MS.90
16.2 Test of paging .91
16.2.1 Normal paging.91
16.2.1.1 Paging request type 1.91
16.2.1.2 Paging request type 2.92
16.2.1.3 Paging request type 3.94
16.2.1.4 MS with no more TMSI available.94
16.2.2 Extended paging .95
16.2.3 Paging reorganisation .96
16.2.4 No change of page mode.97
16.3 Measurement report .98
16.3.1 No neighbouring cells.98
16.3.2 All neighbours present.98
16.3.3 Combination of barred cells and un-permitted PLMNs .99

---------------------- Page: 7 ----------------------

SIST TBR 005 E1:2004
Page 6
TBR 5: November 1993
16.3.4 Use of DTX in the measurement report. 100
16.4 Test of dedicated channel assignment. 100
16.4.1 Assignment completion . 101
16.4.2 Assignment failure . 102
16.5 Test of handover . 103
16.5.1 Non synchronized handover during call in progress towards a TCH/F
without frequency hopping. 103
16.5.2 Non synchronized handover during call in progress, from a TCH/H without
frequency hopping to a TCH/H with frequency hopping . 104
16.5.3 Non synchronized handover during call establishment from TCH/F with
frequency hopping to TCH/F with frequency hopping. 105
16.5.4 Non synchronized handover during call establishment from SDCCH with
frequency hopping to TCH/F without frequency hopping. 106
16.5.5 Synchronized handover during call in progress from TCH/F with frequency
hopping to TCH/F without frequency hopping . 107
16.5.6 Synchronized handover during call in progress from TCH/H with
frequency hopping to TCH/H without frequency hopping . 108
16.5.7 Synchronized handover during call establishment from SDCCH with
frequency hopping to SDCCH with frequency hopping. 109
16.5.8 Synchronized handover during call establishment from TCH/F without
frequency hopping to TCH/F with frequency hopping. 110
16.5.9 Synchronized handover during call establishment from SDCCH without
frequency hopping to TCH/F without frequency hopping. 111
16.5.10 Layer 3 failure on the target cell during non synchronized handover
procedure from TCH/F with frequency hopping to TCH/F without
frequency hopping . 112
16.5.11 Layer 1 failure on the target cell during non synchronized handover
procedure from TCH/F without frequency hopping to TCH/F with
frequency hopping . 113
16.6 Frequency redefinition. 114
16.7 Transmission mode change. 114
16.8 Ciphering mode setting . 115
16.9 Classmark change . 117
16.10 Channel release . 118
17 Elementary procedures of Mobility Management (MM). 119
17.1 Test of TMSI reallocation procedure. 119
17.2 Test of authentication procedure. 119
17.3 Test of identification procedure. 121
17.4 Test of location updating procedure. 122
17.4.1 Location updating accepted. 122
17.4.2 Location updating reject. 123
17.4.2.1 Location updating reject cause "IMSI unknown in HLR". 123
17.4.2.2 Location updating reject cause "PLMN not allowed". 124
17.4.2.3 Location updating reject cause "Location area not
allowed". 125
17.4.3 Abnormal cases during location updating procedure . 127
17.4.3.1 Random access fails. 127
17.4.3.2 Attempt counter smaller than 4, stored LAI different from
broadcast LAI. 128
17.4.3.3 Attempt counter greater or equal to 4, stored LAI different
from broadcast LAI. 130
17.4.3.4 Attempt counter smaller than 4, stored LAI equal to
broadcast LAI. 132
17.4.4 Test of periodic updating . 135
17.5 MM connection establishment. 136
17.5.1 MM connection establishment with cipher mode setting . 136
17.5.2 MM connection establishment rejected with cause "IMSI unknown in VLR"137
18 Tests related to circuit switched Call Control (CC) . 138
18.1 Circuit switched Call Control state machine. 138
18.1.1 Establishment of an outgoing call. 138
18.1.1.1 U0 null state . 138

---------------------- Page: 8 ----------------------

SIST TBR 005 E1:2004
Page 7
TBR 5: November 1993
18.1.1.2 U0.1 MM connection pending.138
18.1.1.2.1 U0.1 MM connection pending - 1st
case .138
18.1.1.2.2 U0.1 MM connection pending - 2nd
case .139
18.1.1.2.3 U0.1 MM connection pending - 3rd
case .140
18.1.1.3 U1 call initiated .140
18.1.1.3.1 U1 call initiated - 1st case.140
18.1.1.3.2 U1 call initiated - second case .141
18.1.1.3.3 U1 call initiated - 3rd case.142
18.1.1.3.4 U1 call initiated - 4th case.142
18.1.1.3.5 U1 call initiated - 5th case.143
18.1.1.3.6 U1 call initiated - 6th case.143
18.1.1.3.7 U1 call initiated - 7th case.144
18.1.1.4 U3 MS originating call proceeding.145
18.1.1.4.1 U3 MS originating call proceeding -
first case .145
18.1.1.4.2 U3 MS originating call proceeding -
2nd case .145
18.1.1.4.3 U3 MS originating call proceeding -
3rd case .146
18.1.1.4.4 U3 MS originating call proceeding -
5th case .147
18.1.1.4.5 U3 MS originating call proceeding -
7th case .147
18.1.1.4.6 U3 MS originating call proceeding -
8th case .148
18.1.1.4.7 U3 MS originating call proceeding -
9th case .149
18.1.1.4.8 U3 MS originating call proceeding -
10th case .149
18.1.1.4.9 U3 MS originating call proceeding -
11th case .150
18.1.1.4.10 U3 MS originating call proceeding -
12th case .150
18.1.1.4.11 U3 MS originating call proceeding -
13th case .151
18.1.1.5 U4 call delivered. .152
18.1.1.5.1 U4 call delivered - 1st case.152
18.1.1.5.2 U4 call delivered - 2nd case.152
18.1.1.5.3 U4 call delivered - case 3a.153
18.1.1.5.4 U4 call delivered - 4th case.153
18.1.1.5.5 U4 call delivered - 5th case.154
18.1.1.5.6 U4 call delivered - 6th case.155
18.1.1.5.7 U4 call delivered - 7th case.155
18.1.1.5.8 U4 call delivered - 8th case.156
18.1.1.6 U10 call active .157
18.1.1.6.1 U10 call active - 1st case.157
18.1.1.6.2 U10 call active - 2nd case.157
18.1.1.6.3 U10 call active - 3rd case .158
18.1.1.6.4 U10 call active - case 4a.159
18.1.1.7 U11 disconnect request.159
18.1.1.7.1 U11 disconnect request - 1st case .159
18.1.1.7.2 U11 disconnect request - 2nd case .160
18.1.1.7.3 U11 disconnect request - 3rd case.161
18.1.1.7.4 U11 disconnect request - 4th case .161
18.1.1.7.5 U11 disconnect request - 5th case .162
18.1.1.8 U12 disconnect indication.162
18.1.1.8.1 U12 Disconnect Indication - 1st case162
18.1.1.8.2 U12 Disconnect Indication - 2nd
case .163
18.1.1.8.3 U12 Disconnect Indication - 3rd case164

---------------------- Page: 9 ----------------------

SIST TBR 005 E1:2004
Page 8
TBR 5: November 1993
18.1.1.8.4 U12 Disconnect Indication - 4th case164
18.1.1.9 U19 Release Request. 165
18.1.1.9.1 U19 Release Request - 1st case . 165
18.1.1.9.2 U19 Release Request - 2nd case . 166
18.1.1.9.3 U19 Release Request - 3rd case. 166
18.1.1.9.4 U19 Release Request -
...

Questions, Comments and Discussion

Ask us and Technical Secretary will try to provide an answer. You can facilitate discussion about the standard in here.